In order to better adapt to the diversified needs of customers,XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD has been working hard to develop products. We can provide you with the highest quality products within your budget. In the future, XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD will focus on technological innovation, continuously improve service quality and develop better products, and is committed to providing customers with products and services that exceed expectations.
(1) The general machine parameter |
|
Suitable roll forming material |
Color steel sheet or galvanized steel sheet |
T hickness |
0. 5-0.7 mm |
Feeding width |
101 mm |
Frame design |
Wall-plate-frame-design /Strong -stand-frame-design |
Roll stages |
15 stages |
Material of forming roller |
45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter |
Φ 75 mm |
Main motor power |
5.5 KW with reducer |
Max. Line speed of roll former |
15 m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power |
4 KW |
Material of cutting blade |
Cr12 , heat treatment |
Electric Standard |
380V / 50H z/3PH or as the customer's requirements |
Machine Dimensions |
6400 mm ×1200 mm ×1680 mm |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer ' s requirements |
(2) PLC Control system |
|
PLC |
Siemens brand (ABB brand is available if required) |
Touch Screen |
Siemens brand (ABB brand is available if required) |
Inverter |
Schneider brand (ABB brand is available if required) |
Encoder |
Omron brand |
(3) P roduct rack |
|
Description |
un-powered, 4 meters length |
(4) Option: CE certificate Please refer to the attached pictures for details |
|
(5) Service after sell |
|
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming ( the seller ) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly . |
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.
FOUNDED IN XIAMEN IN 1989