As XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD continues to develop, we invest heavily in product development every year in order to keep us competitive in the industry. This year, we have successfully worked out the Liming Roll Forming Machine for Shelf Bottom Panel. It is consistent with industry standards. Our capable staff has been devoted to the improvement and upgrades of technology.In the Tile Making Machine,the product is widely used.
Product Description
(1) Pre-Leveling Device |
|
Description |
The In-feed Section of the machine allows for variations in sheet width Pre-Level Device with 4 over 3 shafts to remove the Coil-set |
(2) The general machine parameter |
|
Suitable roll forming material |
Pre-paint Coil , Galvanized coil |
T hickness |
1 . 5 mm - 2.5 mm |
Frame design |
Wall-plate-frame-design /Strong -stand-frame-design |
Roll stages |
15 stages |
Material of forming roller |
GCr15 , CNC lathes, Hard Chrome Coated , Heat treatment |
Shafts Diameter |
Φ 75 mm |
Main motor power |
15 KW , Frequency speed control |
Max. Line speed of roll former |
1 5 m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power |
15 KW |
Material of cutting blade |
Cr12 , heat treatment |
Electric Standard |
380V / 50H z/3PH or as the customer's requirements |
Machine Dimensions |
M achine 1 : 8260mm× 1370mm × 1050mm+part M achine 2: 2000mm× 900mm × 1650mm |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer ' s requirements |
(3) PLC Control system |
|
PLC |
Siemens brand (ABB brand is available if required) |
Touch Screen |
Siemens brand (ABB brand is available if required) |
Inverter |
Schneider brand (ABB brand is available if required) |
Encoder |
Omron brand |
(4)P roduct rack |
|
Description |
U n-powered, 6 meters length |
(5) Option: Cooling system for rollers CE certificate Pneumatic un-loading device Pl refer to the attached pictures for details |
|
(6) Service after sell |
|
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming ( the seller ) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly . |
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.
FOUNDED IN XIAMEN IN 1989