XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD boasts strong R&D capabilities and has been working on product development for years. Xiamen Liming Metal Roof Triangle Roll Forming Machine is our newly-developed product and goes on sale starting now. After years of growth and development, we have been mastering the manufacturing technologies maturely. As its advantages continue to be discovered, it is continually used in more field(s) such as Tile Making Machine. Contact us directly by email or phone call to get more information about our products or services.
(1) Entry bench & Manual Pre-shearing device |
|
Function |
Smart cut control, to cut off the end of the final piece of sheet only |
S hearing Thickness |
Up to Max. 0.8mm (if thickness > 0.8mm, then hydraulic pre-shearing device or electric pre-shearing device will be adopted ) |
(2) The general machine parameter |
|
Suitable roll forming material |
Color steel sheet or galvanized steel sheet |
T hickness |
0. 4mm-0.6 mm |
Feeding width |
310 mm |
Frame design |
Wall-plate-frame-design / New-stand-frame-design |
Roll stages |
14 stages |
Material of forming roller |
45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter |
Φ 75 mm |
Main motor power |
7.5 KW with reducer |
Max. Line speed of roll former |
15 m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power |
4KW |
Material of cutting blade |
Cr12 , hear treatment |
Electric Standard |
380V / 50H z/3PH or as per customer's requirements |
Machine Dimensions |
10760mm× 1960mm × 1650mm |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer ' s requirements |
(3) PLC Control system |
|
PLC |
Siemens brand (ABB brand is available if required) |
Touch Screen |
Siemens brand (ABB brand is available if required) |
Inverter |
Schneider brand (ABB brand is available if required) |
Encoder |
Omron brand |
(4)P roduct rack |
|
Description |
un-powered, 3 units |
(5)Option: CE certificate |
|
(6) Service after sell |
|
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming ( the seller ) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly . |
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.
FOUNDED IN XIAMEN IN 1989