Considering the industry development and customers' requirements, XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD has dedicated to the product development and we've made great achievements. Our technical team has many years of experience in this field and can provide professional opinions, suggestions and solutions experience. When customers encounter technical problems, they can provide door-to-door service. Driven by the corporate vision of 'being the most professional manufacturer and the most reliable exporter in the international market', XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD will pay more attention to enhancing R&D strength, continually upgrade technologies, and optimize organization structure. We encourage all the staff to unite together in this process for creating a better future for the company.
(1) The general machine parameter |
|
Suitable roll forming material |
Color steel sheet or galvanized steel sheet |
T hickness |
0.4-0.6 mm |
Frame design |
Wall-plate-frame-design /Strong -stand-frame-design |
Roll stages |
14 stages |
Material of forming roller |
45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter |
Φ 75 mm |
Main motor power |
5.5 KW |
Max. Line speed of roll former |
15 m/min |
Hydraulic group power |
4 KW |
Material of cutting blade |
Cr12 , hear treatment |
Electric Standard |
380V / 50H z/3PH or as the customer's requirements |
Machine Dimensions |
7650 mm ×1220 mm ×1680 mm |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer ' s requirements |
(2) PLC Control system |
|
PLC |
Siemens brand (ABB brand is available if required) |
Touch Screen |
Siemens brand (ABB brand is available if required) |
Inverter |
Schneider brand (ABB brand is available if required) |
Encoder |
Omron brand |
(3) P roduct rack |
|
Description |
un-powered, 3 units |
(4) Service after sell |
|
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming ( the seller ) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly . |
Below pictures are for your reference only
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment:
Facility water-proof packing, Control cabinet packed in wooden packing.
Payment:
30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.
FOUNDED IN XIAMEN IN 1989