XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD will come to you with special care and you can easily contact them for any information that you may need about the product. It is consistent with industry standards. Relying on our excellent products and sensible marketing strategy,XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD hold a firm belief that we will take a large market share in the future and benefit our stakeholders as well.
(1) 3 Ton s un-coiler |
|
Description |
There are different choice s , please turn to the catalogue of un-coiler |
(2) The general machine parameter |
|
Suitable roll forming material |
Color steel sheet |
T hickness |
0.4-0.6 mm |
Frame design |
Wall-plate-frame-design /New -stand-frame-design |
Roll stages |
14 stages |
Material of forming roller |
45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter |
Φ 75 mm |
Main motor power |
7.5 KW |
Max. Line speed of roll former |
15 m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power |
4 KW |
Material of cutting blade |
Cr12 , hear treatment |
Electric Standard |
380V / 50H z/3PH or as per customer's requirements |
Machine Dimensions |
8850 mm ×1280 mm ×1550 mm |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer ' s requirements |
(3) PLC Control system |
|
PLC |
Siemens brand (ABB brand is available if required) |
Touch Screen |
Siemens brand (ABB brand is available if required) |
Inverter |
Schneider brand (ABB brand is available if required) |
Encoder |
Omron brand |
(4)P roduct rack |
|
Description |
un-powered, 4 meters length |
(5) Option: 1. End-Swedge device after cut-off 2. Elbow machine 3. CE certificate |
|
(5) Service after sell |
|
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming ( the seller ) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly . |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment:
Facility water-proof packing, Control cabinet packed in wooden packing.
Payment:
30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.
FOUNDED IN XIAMEN IN 1989