Leading the roll forming industry since1989, Zheng Liming, your best choice.

Language
VR

It is the utilization of technology that contributes to the high-efficiency manufacturing of the product. In the field(s) of Tile Making Machine , it is highly accepted and widely used. It is designed to meet the industry standard. Over the years,Metal Steel K Span Roll Forming Machine has been widely recognized by customers who have cooperated.


Product Description

1.The Chart of Process Flow
Metal Steel K Span Roll Forming Machine
2.Technical Parameters
The main technial parameters are for your inference only.
Only if you provide the profile required or the real objects of sectional materials,and we will offer the accurate parameters.

(1) 5Tons manual un-coiler
Description There are different choices, please turn to the catalogue of un-coiler
(2) Entry bench & Manual Pre-shearing device
Function
Shearing Thickness
(3) The general machine parameter
Suitable roll forming material Color steel sheet or Aluminum
Thickness 0.8mm-1.5mm
Feeding width
Frame design Wall-plate-frame-design /New-stand-frame-design
Roll stages 26 stages
Material of forming roller 45# steel, CNC lathes, Hard Chrome Coated
Shafts Diameter Φ75 mm
Main motor power 18.5KW with reducer
Max. Line speed of roll former Approx. 14m/min
Electric Standard 380V /50Hz/3PH or as the customer's requirements
Machine Dimensions 8560mm×1970mm×1610mm
Major Color of Machine Painted RAL 5015 (Blue) or as per customer's requirements
(4)  PLC Control system
PLC Siemens brand (ABB brand is available if required)
Touch Screen Siemens brand (ABB brand is available if required)
Inverter Schneider brand (ABB brand is available if required)
Encoder Omron brand
(5) Product rack
Description un-powered, 3 units
(6) Options for tile roof :
A.Hydraulic pre-shearing device
B.Improvement for driving system for Tile roof
Servo motor instead of AC motor for the roll former, to increase the production speed and the tolerance between two stairs
Driving system with gear box and redirector for every three/four stages to improve the speed and tolerance control. Sprocket driving between each three/four stages.
(7) Service after sell
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excluding the electric elements.
Installation:
(1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
(2) If installation is needed, the buyer shall make the following preparation before arrival of technicians.
a) Position the machine in the buyer's factory.
b) Prepare necessary electric wiring.
c) Prepare material of trial running.
d) Provide labors for assistance and installation during installation.
e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly.
(8) About us
Please visit the web site: liming2018.en.made-in-china.com for detailed information

Below pictures are for your reference only

Metal Steel K Span Roll Forming Machine Metal Steel K Span Roll Forming Machine Metal Steel K Span Roll Forming Machine Metal Steel K Span Roll Forming Machine Metal Steel K Span Roll Forming Machine Metal Steel K Span Roll Forming Machine Metal Steel K Span Roll Forming Machine

Metal Steel K Span Roll Forming Machine
After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.

Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

Terms Of Trade

Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.


Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

contact US

GET IN TOUCH WITH US

The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.

Recommended

They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.

Chat
Now

Send your inquiry

Choose a different language
English
Tiếng Việt
Türkçe
ภาษาไทย
বাংলা
русский
Português
한국어
français
Español
Deutsch
العربية
Current language:English