We are proud to provide consistent quality product and dependable service for many years. Compared with other similar Fujian, China (Mainland) products in the market, Roofing Sheet Making Machine, Ridge Cap Roll Forming Machine, Purlin Machine, Floor Decking Roll Forming Machine, Light Gauge Steel Framing Machine, BIPV it can be very stable and long-lasting when applied in the field(s) of Tile Making Machine. We regard Yx65-220-880 Pass Ce Steel Roll Forming Machine for Floor Decking Profile product features as its core competitiveness. Adopting high-quality raw materials purchased from reliable suppliers,XIAMEN ZHENG LIMING has the guaranteed quality and advantages of Roofing Sheet Making Machine, Ridge Cap Roll Forming Machine, Purlin Machine, Floor Decking Roll Forming Machine, Light Gauge Steel Framing Machine, BIPV. Moreover, it has a look designed by our creative designers, making it highly attractive in its appearance.
Type |
Roll former for decking |
Thickness |
0.8mm-1.2mm |
Feeding Width |
1250mm |
Frame Design |
Wall-plate-frame-design /New-stand-frame-design |
Roll Stages |
24+1 stages |
Material Of Forming Roller |
45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter |
Φ75/Φ95mm |
Main Motor Power |
15KWwith reducer |
Max. Line Speed of Roll Former |
15m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic Group Power |
5.5KW |
Material of Cutting Blade |
Cr12, hear treatment |
Electric Standard |
380V /50Hz/3PH or as per customer's requirements |
Machine Dimensions |
PART A: 11560mm×2100mm×1680mm+PART B: 4250mm×2100mm×1680mm (estimated only) |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer's requirements |
After-Sale Service
Installation:
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment:
Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment:
30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
contact US
GET IN TOUCH WITH US
The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.
They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.
FOUNDED IN XIAMEN IN 1989