It is 20 Stages G245-345MPa High Performance C Purlins Bending Machine features and appearance that differentiates it from other products in the market. We pay close attention to the selection of raw materials and the use of manufacturing technologies. In this way, the quality and performance of Roofing Sheet Making Machine, Ridge Cap Roll Forming Machine, Purlin Machine, Floor Decking Roll Forming Machine, Light Gauge Steel Framing Machine, BIPV can be better guaranteed. It is consistent with industry standards. Looking to the future, 20 Stages G245-345MPa High Performance C Purlins Bending Machine will continue to follow the route of independent innovation, and continue to introduce high-tech talents as intellectual support, and strive to achieve the goal of becoming a world-class enterprise.


Product Description

Automatic C Purlin Rolling Machine

20 Stages G245-345MPa High Performance C Purlins Bending Machine


20 Stages G245-345MPa High Performance C Purlins Bending Machine
20 Stages G245-345MPa High Performance C Purlins Bending Machine
1 Item Parameters
2 Size C80-C250
3 Thickness 1.5mm-3.00mm
4 Material Galvanized Sheet
5 Yield Strength 235/345 MPa
6 Feed Width According to the profile
7 Roll Stages 20 Stages




Material: 2.0 mm Minimum Thickness, 3.0mm Maximum Thickness
The 3.0 mm thickness raw material for inspection, in common use
Ex Cold Rolled Coil, Galvanized Coil, Tension grade: G245-345Mpa


20 Stages G245-345MPa High Performance C Purlins Bending Machine

Machine Components

a.  5Ton*600mm manual un-coiler
Un-powered; Load capacity= MAX.5Ton
Coil inner-diameter=470-510mm;
Coil Width= MAX.600mm;


20 Stages G245-345MPa High Performance C Purlins Bending Machine

b.  Pre-Leveling Device
The In-feed Section of the machine allows for variations in sheet width
Pre-Level Device with 4 over 3 shafts to remove the Coil-set


20 Stages G245-345MPa High Performance C Purlins Bending Machine

c.  Hydraulic pre-shearing and Pre-Punching device
Feeding rollers with guide section
Hydraulic Pre-shearing device, manual control
Only for cutting the first piece and the end piece of the sheet
Total two sets of punching stations,
1 st for double holes on the web
2 nd for double holes on the flanges (one hole each flange)
Hydraulic group, pump motor 18.5KW


d.  Cold rolling mills
Feeding section with guide;
Gear/Sprocket driving;14 stages to form
Wall-plate-welding on the base frame

Special vertical rollers to form the side shape
Rollers manufactured from GCr15, CNC lathes, heat treatment
Shaft Diameter=Φ75mm, Precision Machined
Main Motor=18.5KWX2
Forming speed: approx. 7-10m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside, slip type
Hydraulic Cutting device
Stop to Cut, Post Cut
Cutting tool material: Cr12MOV, Heat treatment
Share the same hydraulic group with Pre-punching device


20 Stages G245-345MPa High Performance C Purlins Bending Machine

e.  PLC Control System
Control the quantity &punching length& cutting length automatically
Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider),
Encoder (Omron) , etc
length tolerance≤±2 mm
Control Voltage 24V
(Remote control adopted)


20 Stages G245-345MPa High Performance C Purlins Bending Machine

Product rack Un-powered, 3 units

20 Stages G245-345MPa High Performance C Purlins Bending Machine 20 Stages G245-345MPa High Performance C Purlins Bending Machine 20 Stages G245-345MPa High Performance C Purlins Bending Machine

After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

Terms Of Trade
  1. Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
  2. Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.
Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

contact US

GET IN TOUCH WITH US

The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.

Recommended

They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.

Chat
Now

Send your inquiry

Choose a different language
English
Tiếng Việt
Türkçe
ภาษาไทย
বাংলা
русский
Português
한국어
français
Español
Deutsch
العربية
हिन्दी
සිංහල
日本語
Current language:English