loading

Leading the roll forming industry since1989, Zheng Liming, your best choice.

Language
PRODUCTS
VR

Since established, XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD has placed a great deal of emphasis on new product development.Roofing Sheet Making Machine, Ridge Cap Roll Forming Machine, Purlin Machine, Floor Decking Roll Forming Machine, Light Gauge Steel Framing Machine, BIPV, which is recently developed by us, will be officially sold at very competitive prices. XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD offers a high standard of service together with being competitively priced. Get in touch with us - call, fill in our online form or connect via live chat, we are always happy to help.


Product Description

P arameter
Roll former for Z PURLINE
Thickness 1.5mm-3.05mm
Frame Design Wall-plate-frame-design /New-stand-frame-design
Roll Stages 13 stages
Material Of Forming Roller GCr15, CNC lathes, Heat Treatment, Hard Chrome Coated
Shafts Diameter Φ75mm
Main Motor Power 18.5KW
Max. Line Speed of Roll Former 12m/min (Higher speed is available, depends on the specification
required by the buyer)
Hydraulic Group Power 15 KW
Material of Cutting Blade Cr12, hear treatment
Electric Standard 380V /50Hz/3PH or as per customer's requirements
Machine Dimensions 11350mm×1860mm×1650mm
Major Color of Machine Painted RAL 5015 (Blue) or as per customer's requirements

Cutting Steel Profile Channel Shape Metal Z Purlin Z Channel Roll Forming Machine Factory Price Cutting Steel Profile Channel Shape Metal Z Purlin Z Channel Roll Forming Machine Factory Price

After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

Terms Of Trade
  1. Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
  2. Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.





Basic Information
  • Year Established
    --
  • Business Type
    --
  • Country / Region
    --
  • Main Industry
    --
  • Main Products
    --
  • Enterprise Legal Person
    --
  • Total Employees
    --
  • Annual Output Value
    --
  • Export Market
    --
  • Cooperated Customers
    --

contact US

GET IN TOUCH WITH US

The first thing we do is meeting with our clients and talk through their goals on a future project. During this meeting, feel free to communicate your ideas and ask lots of questions.

Recommended

They are all manufactured according to the strictest international standards. Our products have received favor from both domestic and foreign markets.
They are now widely exporting to 200 countries.

Chat
Now

Send your inquiry

Choose a different language
English
Tiếng Việt
Türkçe
ภาษาไทย
বাংলা
русский
Português
한국어
français
Español
Deutsch
العربية
हिन्दी
සිංහල
日本語
Current language:English