Relying on advanced technology, excellent production capabilities, and perfect service, XIAMEN ZHENG LIMING takes the lead in the industry now and spreads our XIAMEN ZHENG LIMING all over the world. Together with our products, our services are also supplied to be the highest-level. c and z purlin machine XIAMEN ZHENG LIMING have a group of service professionals who are responsible for answering questions raised by customers through the Internet or phone, tracking the logistics status, and helping customers solve any problem. Whether you'd like to get more info on what, why and how we do, try our new product - high quality c and z purlin machine factory, or would like to partner up, we'd love to hear from you.The product has the advantage of temperature resistance. Variations in temperature will not generate significant deviations in its stiffness or fatigue resistance, nor in any of its other mechanical properties.
Our professional engineers have expertise in using technologies. It has a wide scope of range and is widely seen in the field(s) of Purlin Machine. At XIAMEN ZHENG LIMING METALLURGICAL MACHINERY CO.,LTD,customer satisfaction and professional service as well as competitive prices are very important to us, a happy customer is what we strive to achieve. Compared with the traditional ones, it better meets the market demands.
1 | Item | Parameters |
2 | Size | C100-C300/Z120-Z300 |
3 | Material | Galvanized Sheet |
4 | Thickness | 1.5-3.0 mm |
5 | Yield Strength | 235/345 MPa |
6 | Feed Width | According to the profile |
7 | Max. Line Speed Of Roll Former | Approx.25 m/min |
8 | Roll Stages | 20 Stages |
9 | Main Motor Power | 30 KW (Servo Motor) |
10 | Hydraulic Group Power | 15 KW |
11 | Total Power | 45 KW |
12 | Electric Standard | AC380V,50Hz,3Ph |
13 | Machine Dimensions | 11840*1840*2220 |
14 | Total Weight | Approx. 20T |
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.